A stalled project needs a diagnosis before a new contractor.

We start by documenting the current condition: what's been built, what needs correcting, what remains, and what's needed to decide whether to continue.

  • Diagnosis before continuation
  • Written condition report
  • Riyadh
Illustrative image

01From files to decision

The rescue path: four steps

A stalled two-storey villa shell at sunsetIllustrative image
  1. 01

    Receive files and photos

    Any contract, drawings, or prior photos you have, however incomplete.

  2. 02

    Site visit

    A field visit to document the actual execution status against whatever drawings exist.

  3. 03

    Condition report and remaining work

    A written record of completed work, visible defects, and what remains.

  4. 04

    Continuation offer, where suitable

    A scope and price to continue the project, built on the condition report, not a general estimate.

02The diagnostic map

Five separate questions, not one

A sound continuation decision isn't built on a general impression. The condition report splits every structural element into independent questions: does it look finished, has it actually been paid for, are there visible defects, are its documents on file, and what genuinely remains? The table below is illustrative, showing how to read it — it is not data from a real project.

An illustrative example showing how the diagnosis works, not data from an actual project.

Reading key

  • Confirmed
  • Needs verification
  • Flagged
An illustrative example showing how the diagnosis works, not data from an actual project.
Structural elementVisible completionPaid completionVisible defectsMissing documentsRemaining work
01FoundationsConfirmedConfirmedConfirmedConfirmedConfirmed
02ColumnsConfirmedNeeds verificationConfirmedNeeds verificationConfirmed
03BeamsConfirmedConfirmedFlaggedFlaggedConfirmed
04Roof slabsNeeds verificationFlaggedNeeds verificationFlaggedFlagged
05Block masonryFlaggedFlaggedConfirmedNeeds verificationFlagged
06Waterproofing & insulationFlaggedFlaggedNeeds verificationFlaggedFlagged

Select a lens to isolate it in the map

Checking moisture on a plastered wall
Illustrative image

Before deciding to continue

A sound continuation decision isn't built on a general impression.

03What we need from you

Start by sending your project's current condition

The diagnosis starts from these files. Whatever you have on hand helps determine whether the technical review needs a site visit before any continuation offer.

  • 01Current photos of the site
  • 02Available drawings, even if not yet approved
  • 03The prior contract with the contractor
  • 04Receipts or records of payments already made

04Questions

Questions about resuming stalled projects

What files are needed for a price quote?

The permit, approved drawings, and a bill of quantities if one exists, plus the land location and built-up area. We first confirm the files are complete, then determine whether the technical review needs a site visit before we issue a quote.

Can you take over a project another contractor started?

Yes — that's exactly what stalled-project rescue is for. We first document what's been built, visible defects, and remaining work through a site visit, then issue a condition report before any offer to continue.

Is there a site visit before pricing?

For projects that need field verification, yes. The site visit surfaces items the drawings alone don't show — like visible soil conditions or site access constraints — before a final quotation is issued.

A site-office table with architectural drawings, a helmet and a scale ruler
Illustrative image

Stalled project

Diagnosis first, then the decision to continue.

A scope and price to continue the project, built on the condition report, not a general estimate.