Services · Structural Shell

Structural shell isn't just a per-square-meter number.

Each option's scope is spelled out item by item — what Constrak includes, what the owner supplies, and what needs a site visit before it's confirmed.

  • Labor-only shell
  • Shell with materials
  • Riyadh
Illustrative image

01Two ways to build the shell

Labor-only or with materials: the difference is written down before pricing.

Pouring and levelling a villa roof slab
Illustrative image
Gloved hands tying rebar on a slab

In both options Constrak executes on site; what changes is who supplies the materials, and how each scope item is classified.

  • Labor only

    The owner buys materials per the agreed scope; Constrak handles labor, organization, and execution.

  • With materials

    Constrak supplies materials and executes per clear specifications, quantities, and payment terms.

02In section

The structural shell, in section

Pick the shell option, then select any element to read how it is classified in the scope.

The owner buys materials per the agreed scope; Constrak handles labor, organization, and execution.

Classification key

  • Included by Constrak
  • Supplied by owner
  • Priced separately
  • Dependent on drawings
  • Requires site inspection

A schematic illustration of how the shell's elements stack, not a scaled engineering drawing.

03Scope matrix

Why does structural-shell scope differ from one quote to another?

Most late-stage structural-shell disputes come from an item that was never mentioned, not one that was disputed. The scope matrix below spells out every major item across both labor-only and with-materials before any commitment.

The owner buys materials per the agreed scope; Constrak handles labor, organization, and execution.

Scope matrix: Labor only
#ItemLabor only
01Excavation & backfillIncluded by Constrak
02Footings & tie beamsIncluded by Constrak
03Reinforcement steelDiffers between optionsSupplied by owner
04Ready-mix concreteDiffers between optionsSupplied by owner
05Columns & beamsIncluded by Constrak
06Roof slabsIncluded by Constrak
07Block masonryDiffers between optionsSupplied by owner
08Waterproofing & insulationDiffers between optionsDependent on drawings
09Spoil removalDiffers between optionsPriced separately
10Concrete & soil testingRequires site inspection
An engineer checking a slab level with a laser level
Illustrative image

Before pouring

No structural element is poured before its formwork and reinforcement are checked against the approved drawings.

04Build sequence

The build sequence: from excavation to slab

The same stage order shown in the section above, with the mandatory quality hold points embedded at their real place in the sequence.

Ground-floor columns with rebar starters and scaffoldingIllustrative image
  1. 01

    Excavation

    Mandatory hold point

    Testing

    Concrete and soil testing where needed, specified in the quotation before pricing.

  2. 02

    Foundations

  3. 03

    Grade beams

    Mandatory hold point

    Before pouring

    Formwork and reinforcement checked against approved drawings before any structural element is poured — this check repeats before every subsequent cast element (columns, beams, slabs).

  4. 04

    Columns

  5. 05

    Beams

    Mandatory hold point

    During execution

    Periodic checkpoints documented with photos, tied to the weekly progress report.

  6. 06

    Roof slabs

Final inspection and the snag list happen at handover, beyond the structural-shell scope. Full detail on the Quality page

05Before pricing

Project files we need from you

  • 01

    The building permit

  • 02

    Approved drawings

  • 03

    Bill of quantities (if available)

You can send files later via WhatsApp if they're not ready now.

06Questions

Questions about the structural shell

What files are needed for a price quote?

The permit, approved drawings, and a bill of quantities if one exists, plus the land location and built-up area. We first confirm the files are complete, then determine whether the technical review needs a site visit before we issue a quote.

Who buys the materials?

It depends on the agreed scope: the owner buys under labor-only, Constrak supplies under with-materials. This is spelled out item by item in the quotation before signing.

How are payment milestones structured?

Each payment is tied to a defined execution stage and completion evidence agreed in the contract, not a calendar separate from actual progress. No payment is requested without verifiable work behind it.

Is there a site visit before pricing?

For projects that need field verification, yes. The site visit surfaces items the drawings alone don't show — like visible soil conditions or site access constraints — before a final quotation is issued.

A complete two-storey concrete structural shell: slabs, columns and stair core
Illustrative image

Next step

Send your drawings, and we will set out the shell scope item by item.

We first confirm the files are complete, then determine whether the technical review needs a site visit before we issue a quote.